
Page 35
The Wash down Station is installed. It does have glass on it. I just didn't take any pix's, my hands were sticky. HeHe



I had some 1/4in plastic signboard laying around. I was going to install strips of stainless steel for the lip. The plastic signboard will be just fine.


I got the T-H latchs today. I didn't take much to get them installed.

The filler panel has
3 layers of 9oz tape on the perimeter. (2in, 3in & 4in wide)
One layer of 1808 & 6oz vacuum bagged on the flat parts front & back.
I put that much glass on the edges, because I figured that is where most of the
banging will get done.
